top of page
Sobre las nubes

nuestroshitos

Enfrentando los desafíos más complejos

A lo largo de una extensa trayectoria, nuestros profesionales han completado procesos para más de 1.000 aeronaves, gestionando y protegiendo presupuestos de clientes que superan los 300 millones de dólares en una amplia variedad de modelos de aeronaves, incluyendo: ATR-42, Jetstream 3200, Canadair CL-44, BAC 1-11 Series, Falcon 7X, Fokker F-28, B-727, B-767, A310, DC-9/30/50, MD-80 Series, B-737 Series, B-777, A340 Series, Casa CN235, B-707/300, B-747/-200/-400/-SP, B-787/-8/-9, A320FAM/321, y Embraer 190.

Boeing 747 Makes Historic Flight After Emergency Landing at NYC

Avión

Our staff executed an extraordinary recovery operation after a Boeing 747-200 landed at New York City Airport with only three functioning engines. The aircraft had suffered a fire in Engine No. 1 and had an inoperative Auxiliary Power Unit (APU), requiring meticulous inspections and legal clearances before it could embark on a ferry flight to Buenos Aires, Ezeiza Airport (EZE).

Both Boeing and the Federal Aviation Administration (FAA) granted approval under special operational instructions, marking this as the longest route ever performed under such challenging conditions.

The successful completion of this mission stands as a testament to the exceptional coordination between the involved authorities and the skill of our maintenance teams.This historic flight underscores the resilience and dedication within the aviation industry, ensuring that even under dire circumstances, safety and compliance remain paramount.

Aeronautical engineer career

Aeronautical engineer career

Aeronautical alphabet

Aeronautical alphabet

MRO

MRO

Maintenance

Maintenance

AIRPLANE

AIRPLANE

NEO

NEO

Aviation Structural Mechanic

Aviation Structural Mechanic

MECHANICS

MECHANICS

job

job

Airplanes

Airplanes

Aeronautical engineer career

Aeronautical engineer career

Painting MRO

Painting MRO

Maintenance, Repair and Operations

Maintenance, Repair and Operations

IATA code MRO

IATA code MRO

overhaul

overhaul

A-340

Development of the entire work program.

Development of the entire work program, from the engineering to the workshop, to complete the first 12-year structural maintenance on the A340 fleet in Latin America.

About us

Consulting services

Projects

Training Programs

B-777

B-777 fleet (10 airplanes) Cabin Retrofit.

B-777 fleet (10 airplanes) Cabin Retrofit. Coordination of work teams to meet modification goals focusing on TAT, quality, and costs. 

About us

Consulting services

Projects

Training Programs

B-767

Pax to Cargo Conversion MOD.

B-767 (5 airplanes) Pax to Cargo Conversion MOD. Coordination of work teams to meet modification goals focusing on TAT, quality, and costs.

About us

Consulting services

Projects

Training Programs

B-767

Chilean Air Force (FACH)

Entry into service of the B767 designated for the Chilean Air Force (FACH) to operate as the official Chilean Presidential aircraft.

About us

Consulting services

Projects

Training Programs

Special Projects

American Falcon

Analysis, review and preparation of all necessary documents for the Aeronautical Authority to register new aircraft for starting up commercial operations. American Falcon (1998)

About us

Consulting services

Projects

Training Programs

Special Projects

 Southern Winds

Analysis, review and preparation of all necessary documents for the Aeronautical Authority to register new aircraft for starting up commercial operations. Southern Winds (1996) airlines.

About us

Consulting services

Projects

Training Programs

Special Projects 

Latam

Development of the LATAM Continued Airworthiness Area comprised of the Record Keeping, Part Control, Airworthiness Directives, and Certification Departments.

About us

Consulting services

Projects

Training Programs

B-747

Recuperación de un B-747/200 dañado en el Aeropuerto de Nueva York por un camión de LHT.

Reparación mayor diseñada y gestión de aprobación por Boeing y la FAA para liberar el vuelo a EZE, BUE.

About us

Consulting services

Projects

Training Programs

B-747

Recuperación de un B-747/200 que aterrizó en el Aeropuerto de Nueva York con 3 motores.

Recuperación de un B-747/200 que aterrizó en el Aeropuerto de Nueva York con 3 motores debido a un incendio en el motor N°#1 y el APU INOP. Inspecciones y asuntos legales gestionados para el vuelo de traslado a EZE, BUE, aprobado por Boeing y la FAA bajo instrucciones operativas especiales, siendo la ruta más larga jamás realizada y permitida bajo estas condiciones.

About us

Consulting services

Projects

Training Programs

B-747

Modificación estructural de la Sección 41 del B-747/200.

Desarrollo del programa de cumplimiento.

About us

Consulting services

Projects

Training Programs

B-747

Retroadaptación de la cabina de la flota B-747/200

Desarrollo de documentos de ingeniería por parte del titular del STC, coordinación de talleres y proceso de inspección de aprobación.

About us

Consulting services

Projects

Training Programs

B-747

Conversión del compartimento superior del B747-200 a una configuración especial ejecutiva

Desarrollo de ingeniería, gestión de aprobaciones y coordinación de talleres. Requisito de la Presidencia de la Nación Argentina.

About us

Consulting services

Projects

Training Programs

B-737

Conversión completa del B737-200 a configuración ejecutiva.

Desarrollo de ingeniería, gestión de aprobaciones y coordinación de talleres.

About us

Consulting services

Projects

Training Programs

bottom of page