top of page
Sobre las nubes

UntoldStories

Facing the most complex challenges

Through a long and extensive trajectory, our professionals have completed processes for over 1.000 aircraft, managing and safeguarding clients' budgets exceeding 300 million dollars across a wide variety of aircraft models, including: ATR-42, Jetstream 3200, Canadair CL-44 ,BAC 1-11 Series, Falcon 7X, Fokker F-28, B-727,B-767, A310, DC-9/30/50, MD-80 Series, B-737 Series, B-777, A340 Series, Casa CN235, B-707/300, B747 / -200 / -400 / -SP, B-787 / -8 / -9,  A320FAM/321,Embraer 190.    

Boeing 747 Makes Historic Flight After Emergency Landing at NYC

Avión

Our staff executed an extraordinary recovery operation after a Boeing 747-200 landed at New York City Airport with only three functioning engines. The aircraft had suffered a fire in Engine No. 1 and had an inoperative Auxiliary Power Unit (APU), requiring meticulous inspections and legal clearances before it could embark on a ferry flight to Buenos Aires, Ezeiza Airport (EZE).

Both Boeing and the Federal Aviation Administration (FAA) granted approval under special operational instructions, marking this as the longest route ever performed under such challenging conditions.

The successful completion of this mission stands as a testament to the exceptional coordination between the involved authorities and the skill of our maintenance teams.This historic flight underscores the resilience and dedication within the aviation industry, ensuring that even under dire circumstances, safety and compliance remain paramount.

Aeronautical engineer career

Aeronautical engineer career

Aeronautical alphabet

Aeronautical alphabet

MRO

MRO

Maintenance

Maintenance

AIRPLANE

AIRPLANE

NEO

NEO

Aviation Structural Mechanic

Aviation Structural Mechanic

MECHANICS

MECHANICS

job

job

Airplanes

Airplanes

Aeronautical engineer career

Aeronautical engineer career

Painting MRO

Painting MRO

Maintenance, Repair and Operations

Maintenance, Repair and Operations

IATA code MRO

IATA code MRO

overhaul

overhaul

A-340

Development of the entire work program.

Development of the entire work program, from the engineering to the workshop, to complete the first 12-year structural maintenance on the A340 fleet in Latin America.

About us

Consulting services

Projects

Training Programs

B-777

B-777 fleet (10 airplanes) Cabin Retrofit.

B-777 fleet (10 airplanes) Cabin Retrofit. Coordination of work teams to meet modification goals focusing on TAT, quality, and costs. 

About us

Consulting services

Projects

Training Programs

B-767

Pax to Cargo Conversion MOD.

B-767 (5 airplanes) Pax to Cargo Conversion MOD. Coordination of work teams to meet modification goals focusing on TAT, quality, and costs.

About us

Consulting services

Projects

Training Programs

B-767

Chilean Air Force (FACH)

Entry into service of the B767 designated for the Chilean Air Force (FACH) to operate as the official Chilean Presidential aircraft.

About us

Consulting services

Projects

Training Programs

Special Projects

American Falcon

Analysis, review and preparation of all necessary documents for the Aeronautical Authority to register new aircraft for starting up commercial operations. American Falcon (1998)

About us

Consulting services

Projects

Training Programs

Special Projects

 Southern Winds

Analysis, review and preparation of all necessary documents for the Aeronautical Authority to register new aircraft for starting up commercial operations. Southern Winds (1996) airlines.

About us

Consulting services

Projects

Training Programs

Special Projects 

Latam

Development of the LATAM Continued Airworthiness Area comprised of the Record Keeping, Part Control, Airworthiness Directives, and Certification Departments.

About us

Consulting services

Projects

Training Programs

B-747

Recovery of a B-747/200 damaged in NYC Airport by a LHT Truck

Major repair designed and approval management by Boeing and the FAA to release the flight to EZE, BUE.

About us

Consulting services

Projects

Training Programs

B-747

Recovery of a B-747/200 that landed at NYC Airport with 3 ENGs

Recovery of a B-747/200 that landed at NYC Airport with 3 ENGs due to a fire in the N°#1 and the APU INOP. Inspections and legal matters handled for the ferry flight to EZE, BUE approved by Boeing and the FAA under special operational instructions, making it the longest route ever performed and allowed under these conditions.

About us

Consulting services

Projects

Training Programs

B-747

 B-747/200 Section 41 Structural Modification.

Development of the accomplishment program.
 

About us

Consulting services

Projects

Training Programs

B-747

B-747/200 Fleet Cabin Retrofit.

Development of engineering documents from the STC Holder, workshop coordination and approval inspection process. 

About us

Consulting services

Projects

Training Programs

B-747

B747-200 Upper Deck Conversion to Executive Special Config

Engineering development, approval management and workshop coordination. Requirement from the Presidency of the Argentine Nation.

About us

Consulting services

Projects

Training Programs

B-737

B737-200 Full Executive Conversion.

Engineering development, approval management and workshop coordination. 

About us

Consulting services

Projects

Training Programs

bottom of page